SPMT's/Hydraulic Modular Trailer/ TBM Tunneling Machine for sale! - THI

TIANJIE/TIANDI Manufacture & Supply: SPMT's Self-Propelled Modular Transporter, Multi axle trailer, modular trailer, TBM-Shield Machnie, other special transport vehicles & tunneling euipment. Email: tiandihi@gmail.com Sourcing Service: Crane, Gantry Crane, Construction machinery, SPVs, etc.

Flickr Photostream

Wednesday, December 9, 2009

4files heavy haulage

4 files side by side combination

If you need this trailer, feel free to contact me

Jeff Lee
+86 186 0768 9697
Email: jeffgbc@gmail.com


4files heavy haulage

4 files side by side combination

If you need this trailer, feel free to contact me

Jeff Lee
+86 186 0768 9697
Email: jeffgbc@gmail.com


Thursday, November 19, 2009

China TIANDI SPMT Commissioning




TIANDI's new TJV4 SPMT under commissioning in factory yard.

Here is a standard configuration of TJV4 SPMT

20 lines Self propelled modular trailer Main technical Specification:

1 Kerb weight(Kg) 81800
2 Rated speed (Ground, full load)(Km/h) 5 (PPU drive)
3 Max. speed(empty load)(Km/h)  10 (PPU drive)
4 Max. Pulling force(N) 480000
5 Platform measrurement(L×W×H)(mm) 30980×2990×1070±300
6 Outer measurement(L×W×H)(mm) 35875×2990×1070±300
7 Wheelbase(mm) 1550
8 Tread(mm) 1820/735
9 Approaching Angle/Departure Angle 6°/6°
10 First wheel Max. steering angle 50°
11 Drive axle 6
12 Axle lines 20
13 Tyre spec 215/75R17.5 or 7.50R15
14 Rim spec. 17.5×6.00
15 tyre number 160
16 Syspension type Hydraulic
17 Engine power/speed 375Kw/2000rpm
18 Engine model  D2876LUE604

Technorati 标签: , , , , , ,

China TIANDI SPMT Commissioning




TIANDI's new TJV4 SPMT under commissioning in factory yard.

Here is a standard configuration of TJV4 SPMT

20 lines Self propelled modular trailer Main technical Specification:

1 Kerb weight(Kg) 81800
2 Rated speed (Ground, full load)(Km/h) 5 (PPU drive)
3 Max. speed(empty load)(Km/h)  10 (PPU drive)
4 Max. Pulling force(N) 480000
5 Platform measrurement(L×W×H)(mm) 30980×2990×1070±300
6 Outer measurement(L×W×H)(mm) 35875×2990×1070±300
7 Wheelbase(mm) 1550
8 Tread(mm) 1820/735
9 Approaching Angle/Departure Angle 6°/6°
10 First wheel Max. steering angle 50°
11 Drive axle 6
12 Axle lines 20
13 Tyre spec 215/75R17.5 or 7.50R15
14 Rim spec. 17.5×6.00
15 tyre number 160
16 Syspension type Hydraulic
17 Engine power/speed 375Kw/2000rpm
18 Engine model  D2876LUE604

Technorati 标签: , , , , , ,

Monday, November 16, 2009

TJV4 SPMT Commissioning

TIANDI'S new SPMT(self propelled modular transporter) has finished assembling and under commissioning in TIANDI's factory yard. This TJV4 SPMT use MAN diesel engine (Model: D2876LUE604, 375kw/2000rpm). Rexroth hydraulic motor & reducer and other key parts all from famous top class suppliers, which ensure whole system with good stability and powerful work force.

This SPMT is ordered by GPEG-LIFT, with 36 lines conventional TJV4 type hydraulic modular trailer. the who system can achieve heavy transport mission capacity up to 1200ton.

TJV4 SPMT Commissioning

TIANDI'S new SPMT(self propelled modular transporter) has finished assembling and under commissioning in TIANDI's factory yard. This TJV4 SPMT use MAN diesel engine (Model: D2876LUE604, 375kw/2000rpm). Rexroth hydraulic motor & reducer and other key parts all from famous top class suppliers, which ensure whole system with good stability and powerful work force.

This SPMT is ordered by GPEG-LIFT, with 36 lines conventional TJV4 type hydraulic modular trailer. the who system can achieve heavy transport mission capacity up to 1200ton.

Tuesday, September 15, 2009

Sudan heavy haulage posted in Biglorryblog!


My first post in Biglorryblog!

=========>>


Jeff Lee has been shifting
heavy things in the Sudan... Where there's an awful lot of sand says
Biglorryblog!


| 2
Comments
| No
TrackBacks



P1070017[1].JPG


"Dear Editor of Biglorryblog," says Jeff Lee from the Shanghai Fulangjie
company."I'm one of your fans for your fantastic blog and thanks for showing us
so many big lorries with great stories and technology from around the world.I'm
just back from Sudan last week after finishing a tough mission with 2x10lines of
hydraulic-modular trailers which are produced by our group Tiandi Heavy
Industries(THI)."


P1070199[1].JPG


Jeff continues: "During this transport mission, the fleet had to pass through
the coastal region of the Red Sea hills area - mainly desert (with lots of bad
sand and rain storms!) and difficult off-road conditions. I've taken some
pictures during my work and think this Africa heavy haulage story may be
interesting for you." To which BLB replies yer darn tootin Jeff! great stuff.
And click through here to see just how 'demanding' the conditions were... And
how you can see more of Jeff''s pictures...



P1070506[1].JPG


Road... What road...? Jeff says the move was carried out using two 480hp MAN
6x6 prime mover, 2x10lines TIANDI TJV1-k type Hydraulic modular trailers. The
contract called for the transportation of five 150-tonne MAN Diesel Engines from
Port Sudan to Atbara over a distance:of 500km...


P1070368[1].JPG


Sand everywhere andtemperatures from 23-50 degrees celsius!  Wide humidity
range too (15%-85%), And the conditions: "Sea port, winding & high gradient
of hills area, Desert, Sand Storm, Rain Storm, Offroad, Soft clay base, etc"
says Jeff.


P1070335[1].JPG

.

And yet more sand! "You can also visit my company website says jeff at www.fulangjie.com or my personal blog at
sinohi.blogspot.com and flickr: jefflee09. Regards, Jeff Lee."


Technorati 标签: , , , ,

Sudan heavy haulage posted in Biglorryblog!


My first post in Biglorryblog!

=========>>


Jeff Lee has been shifting
heavy things in the Sudan... Where there's an awful lot of sand says
Biglorryblog!


| 2
Comments
| No
TrackBacks



P1070017[1].JPG


"Dear Editor of Biglorryblog," says Jeff Lee from the Shanghai Fulangjie
company."I'm one of your fans for your fantastic blog and thanks for showing us
so many big lorries with great stories and technology from around the world.I'm
just back from Sudan last week after finishing a tough mission with 2x10lines of
hydraulic-modular trailers which are produced by our group Tiandi Heavy
Industries(THI)."


P1070199[1].JPG


Jeff continues: "During this transport mission, the fleet had to pass through
the coastal region of the Red Sea hills area - mainly desert (with lots of bad
sand and rain storms!) and difficult off-road conditions. I've taken some
pictures during my work and think this Africa heavy haulage story may be
interesting for you." To which BLB replies yer darn tootin Jeff! great stuff.
And click through here to see just how 'demanding' the conditions were... And
how you can see more of Jeff''s pictures...



P1070506[1].JPG


Road... What road...? Jeff says the move was carried out using two 480hp MAN
6x6 prime mover, 2x10lines TIANDI TJV1-k type Hydraulic modular trailers. The
contract called for the transportation of five 150-tonne MAN Diesel Engines from
Port Sudan to Atbara over a distance:of 500km...


P1070368[1].JPG


Sand everywhere andtemperatures from 23-50 degrees celsius!  Wide humidity
range too (15%-85%), And the conditions: "Sea port, winding & high gradient
of hills area, Desert, Sand Storm, Rain Storm, Offroad, Soft clay base, etc"
says Jeff.


P1070335[1].JPG

.

And yet more sand! "You can also visit my company website says jeff at www.fulangjie.com or my personal blog at
sinohi.blogspot.com and flickr: jefflee09. Regards, Jeff Lee."


Technorati 标签: , , , ,

Thursday, September 10, 2009

Tough mission accomplished by multi axle trailer in Sudan

I was dispatched last month to Sudan with our engineer for an after sales mission and following the first operation  of 2 x 10 lines TIANDI TJV1-k type hydraulic modular trailer.

Following is my report in FLJ's offical website. More details will be posted in my blog later.

------------------>

August, 2009 Sudan

Machine: 2x10lines TIANDI TJV1-k type Hydraulic modular trailer

Mission: 5 units of 150t MAN Diesel Engines from Port Sudan to Atbara!

Distance: 500km

Condiction: Wide temperature range(23-50C), Wide humidity range(15%-85%), Sea port, winding & high gradient of Hill area, Desert, Sand Storm, Rain Storm, Offroad, Soft clay base, etc.

THI-FLJs after sales team arrived Sudan at August, 2009 for two new 10 lines TIANDI TJV1-k (3400mm wide) type Hydraulic Modular Trailers reassembling, commissioning, and first operation.







After a one week reassembling, commissioning and training under the temperature of 45-50C in Port Sudan, the whole transport team with THI-FLJ After sales team are all ready. Two TIANDI modular trailers are ready for their first heavy transport mission in Sudan.





Today FLJ will present you a full follow-up report for the two 10 axle lines TJV1-k type HMT on the tough journey!





Loading!







10% Gradient of up and down in the Agaba Hill of Red sea hills.







The next day morning after a terrible sand storm and rain storm for a whole night in the desert.







30km Off-road and soft clay base







Arrive to the new 2 billion USD Cement factory project.

These two 10lines TIANDI hydraulic modular trailer have successfully finished their first mission in Sudan with perfect performance, which makes THI proceed with more confidence on providing more reliable heavy transport vehicles to all our clients around the world.





Tough mission accomplished by multi axle trailer in Sudan

I was dispatched last month to Sudan with our engineer for an after sales mission and following the first operation  of 2 x 10 lines TIANDI TJV1-k type hydraulic modular trailer.

Following is my report in FLJ's offical website. More details will be posted in my blog later.

------------------>

August, 2009 Sudan

Machine: 2x10lines TIANDI TJV1-k type Hydraulic modular trailer
Mission: 5 units of 150t MAN Diesel Engines from Port Sudan to Atbara!
Distance: 500km
Condiction: Wide temperature range(23-50C), Wide humidity range(15%-85%), Sea port, winding & high gradient of Hill area, Desert, Sand Storm, Rain Storm, Offroad, Soft clay base, etc.

THI-FLJs after sales team arrived Sudan at August, 2009 for two new 10 lines TIANDI TJV1-k (3400mm wide) type Hydraulic Modular Trailers reassembling, commissioning, and first operation.



After a one week reassembling, commissioning and training under the temperature of 45-50C in Port Sudan, the whole transport team with THI-FLJ After sales team are all ready. Two TIANDI modular trailers are ready for their first heavy transport mission in Sudan.


Today FLJ will present you a full follow-up report for the two 10 axle lines TJV1-k type HMT on the tough journey!


Loading!



10% Gradient of up and down in the Agaba Hill of Red sea hills.



The next day morning after a terrible sand storm and rain storm for a whole night in the desert.



30km Off-road and soft clay base



Arrive to the new 2 billion USD Cement factory project.

These two 10lines TIANDI hydraulic modular trailer have successfully finished their first mission in Sudan with perfect performance, which makes THI proceed with more confidence on providing more reliable heavy transport vehicles to all our clients around the world.



Tuesday, August 4, 2009

TIANDI lauches new hydraulic modular trailer

51.Chinese Leading Special Heavy Transport Vehicles Manufacturer - TIANDI Group (THI) and it's sub co. FLJ have just launched it's new TJV2 hydraulic moduar trailer which is also knowed as multi axle trailer. This trailer is the new upgrade version from TIANDI's regular TJV1 2990mm width modular trailer.

TJV2

By remaining the great loading capacity (22.5ton @ 18km/h) as those previous models, TJV2's main upgrade features are as follows:
Smaller turning radius: The TJV2 trailer's first wheel steering angle has been upgraded from +/-50 degrees to +/-55 degrees.
Better passing through capacity: Platfrom height from 1080 +290/-310mm changed to 1080 +/-325mm, which makes the trailer has even better passing through capacity on rough road.
Easy connection: The pipe connecting system is moved to both side of the trailer, which is easier for piping line connection during module combination. Fast connectors helps to increase work efficiency and safty.

the one follow is TIANDI's regular TJV1 Hydraulic Modular trailer

TJV1
(According to customer requirement, TJV1 can be adjust to combine with Nicolas MDE type and TJV2 can be adjust to couple with Nicolas MDED type from Europe.)

More detail features please feel free to contact tiandihi@gmail.com or msn with jefflee@live.com.

Sunday, January 11, 2009

SCHEUERLE SPMT been tested before delivery for Australia Mining Company

SCHEUERLE transporters for handling 700 tons strip mining excavators
Reported by Transportweekly 22.12.2008 (Pictures from BigLorryBlog)

SCHEUERLE received an order from the company Griffin Coal Mining in Perth, West Australia, to deliver heavy duty transport vehicles for transportation of huge excavators and dumpers, which are used in the coal mining industry. The machines, weighing up to 700 tons, put very special demands on the transporters. After about one year of development and construction the self-propelled transport system, which is based on the successful SCHEUERLE InterCombi series, has now been tested extensively before delivery.


Griffin Coal Mine is one of the biggest strip mining companies in Australia. Approx. 200 kilometres south-eastern of Perth, about 3 million tons of coal is mined annually. Already during the beginning of the Australian industrialisation, the Griffin Coal Mine played an important role by supplying to the national railway company. By now Griffin Coal Mine Company is one of the major subcontractors of the West-Australian energy sector, that operates several energy producing power plants with coal from the so-called „Colli Basins“.
If additional coal fields are to be made accessible to secure future energy supplies, massive excavators and dumpers also have to be relocated to this new site. However, a strip mining excavator, which can weigh up to 700 tons, is not designed for covering long distances. For this reason Griffin Coal Mine Company placed an order with SCHEUERLE to develop a powerful transport system.
This system is based on the successful SCHEUERLE heavy duty transport vehicles of the “InterCombi” series. Four 6-axle modules and two 2-axle modules can be coupled with one another depending on the load. 20 of a total of 56 pendulum axles possess a hydrostatic drive. To assure the traction drive, these axles are charged with pressure oil by two Power-Pack Units (PPUs). Also fed by the Power-Pack Units are the steering cylinder and the axle compensation cylinder, which position the vehicle platform for loading and unloading accordingly and ensure the necessary axle compensation while driving at ground unevenness. The transport combination is controlled by a radio remote control unit. Via joy-stick all important functions like forward and backward gear as well as the steering can be handled. If the transport of a huge excavator is operated, the vehicle combinations can be coupled side-by-side with 14 axle lines each and connected with distance bearings. The combination is lowered at rear and raised at front: A drive-up bevel is formed, which enables the excavator to navigate onto the platform trailers from behind. The distance between the ground and the platform elevation at rear is bridged with drive-up wedges. When the excavator has reached its scheduled position, the transport system of Intercombi vehicles will be levelled back to drive elevation.With the hydrostatic-driven SCHEUERLE heavy duty transport combination, the West Australian customer Griffin Coal Mine Company receives a very flexible transport system, which enables an efficient, fast and reliable transport of heavy machines or ulterior equipments of strip mining companies.

SCHEUERLE SPMT been tested before delivery for Australia Mining Company

SCHEUERLE transporters for handling 700 tons strip mining excavators
Reported by Transportweekly 22.12.2008 (Pictures from BigLorryBlog)

SCHEUERLE received an order from the company Griffin Coal Mining in Perth, West Australia, to deliver heavy duty transport vehicles for transportation of huge excavators and dumpers, which are used in the coal mining industry. The machines, weighing up to 700 tons, put very special demands on the transporters. After about one year of development and construction the self-propelled transport system, which is based on the successful SCHEUERLE InterCombi series, has now been tested extensively before delivery.


Griffin Coal Mine is one of the biggest strip mining companies in Australia. Approx. 200 kilometres south-eastern of Perth, about 3 million tons of coal is mined annually. Already during the beginning of the Australian industrialisation, the Griffin Coal Mine played an important role by supplying to the national railway company. By now Griffin Coal Mine Company is one of the major subcontractors of the West-Australian energy sector, that operates several energy producing power plants with coal from the so-called „Colli Basins“.
If additional coal fields are to be made accessible to secure future energy supplies, massive excavators and dumpers also have to be relocated to this new site. However, a strip mining excavator, which can weigh up to 700 tons, is not designed for covering long distances. For this reason Griffin Coal Mine Company placed an order with SCHEUERLE to develop a powerful transport system.
This system is based on the successful SCHEUERLE heavy duty transport vehicles of the “InterCombi” series. Four 6-axle modules and two 2-axle modules can be coupled with one another depending on the load. 20 of a total of 56 pendulum axles possess a hydrostatic drive. To assure the traction drive, these axles are charged with pressure oil by two Power-Pack Units (PPUs). Also fed by the Power-Pack Units are the steering cylinder and the axle compensation cylinder, which position the vehicle platform for loading and unloading accordingly and ensure the necessary axle compensation while driving at ground unevenness. The transport combination is controlled by a radio remote control unit. Via joy-stick all important functions like forward and backward gear as well as the steering can be handled. If the transport of a huge excavator is operated, the vehicle combinations can be coupled side-by-side with 14 axle lines each and connected with distance bearings. The combination is lowered at rear and raised at front: A drive-up bevel is formed, which enables the excavator to navigate onto the platform trailers from behind. The distance between the ground and the platform elevation at rear is bridged with drive-up wedges. When the excavator has reached its scheduled position, the transport system of Intercombi vehicles will be levelled back to drive elevation.With the hydrostatic-driven SCHEUERLE heavy duty transport combination, the West Australian customer Griffin Coal Mine Company receives a very flexible transport system, which enables an efficient, fast and reliable transport of heavy machines or ulterior equipments of strip mining companies.