More details for my report on Biglorryblog for Our TJV4 trailer with Bridge Girder transport for the big transformer:
It’s transport of a 334t transformer, dimension: 12.6m(L)x3.46m(W)x4.88m(H), transported by 12+12 TIANDI TJV4 trailer with a 450t bridge girder, entire length 78m, width 4.5m.
Time: October 2009.
Spend time: Two day and one night
Transport distance: around 60km.
The total transport distance is from HUANGPU PORT to East area of Guangzhou city, Guangdong Province, South China. I was told that this transport cross a Rail-bridge with 4.96m height and a 90°-turn with only 20mm distance(tolerance) to a wall of the inter side of the Conner(without break down the wall).
--------------------------------------------